A truck driver has been fined $12,600 for damaging Saskatoon’s 108th Street overpass with an overpass with an oversized load earlier this year. The driver was hauling a load for KeyLee Contracting when the overpass was struck on March 11. In Saskatoon Bylaw Court Wednesday, the driver pleaded guilty to damaging city infrastructure under the city’s traffic bylaw. “The court accepted a joint submission from the City Bylaw Prosecutor and the driver in which the driver would pay a fine of $9,000 plus a victim surcharge of $3,600,” the city said Wednesday afternoon. The city said the maximum fine that can be imposed on an individual under the bylaw is $10,000. A separate traffic bylaw charge against Martensville-based KeyLee Contracting has been adjourned until Dec. 16. The city also filed a claim with the company’s insurer and the driver’s insurer to recover the cost of repairs to the overpass. The penalty marks the second time this year a driver has been fined for damaging a Saskatoon overpass. In June, a driver responsible for striking an overpass on Circle Drive and Highway 11 and 16 was fined $11,200. That collision happened March 5 when a flatbed trailer carrying a large tracked excavator struck the cloverleaf overpass. The semi belonged to Regina-based Bowling Logistics which also pleaded guilty. Saskatoon has seen a growing number of incidents involving vehicles striking overpasses this year. On Wednesday, the city saw its eighth overpass strike of 2026 when a semi truck struck an overpass on Circle Drive and Highway 11. The city says it’s working with industry stakeholders on an awareness campaign expected to launch in early 2027. According to the city, all Saskatoon overpasses are marked with height clearance signs and permits are required for loads higher than 4.15 metres on city streets and provincial highways. The city says it is the responsibility of the trucking industry to ensure oversized loads are transported safely. Saskatoon also plans to test a camera monitoring system at the 108th Street overpass. The pilot project will be evaluated to determine whether similar systems should be installed at other locations.